Optimal for an annual waste volume of up to 450 tonnes
VOLUMEN
PROCESS QUANTITY
* Based on a density of 0.1-0.3 um (XX)** Based on 250 days of operation
Optimal for an annual waste volume of up to 540 tonnes
VOLUME
Optimal for an annual waste volume of up to 900 tonnes
Optimal for an annual waste volume of up to 1260 tonnes
Optimal for an annual waste volume of up to 1440 tonnes